Interior decoration construction specification

Home decoration consumers are most concerned about whether the quality of home improvement can be guaranteed. On-site construction sites can directly reflect the quality of home improvement. In particular, the details concerning the quality of home improvement can be demonstrated on the site. Carefully reviewing these links can not only inspect the construction quality of the workers, but also can be found in the home improvement process. Problems before they occur. Here we will take a look at the interior decoration construction specification , hoping to help the friend who is decorating.

Interior decoration specification

Early construction period - home improvement materials approach

When the home improvement construction has just started, it is necessary to communicate with the construction workers in time to find out whether their own renovation works have been outsourced. Once they are found outsourcing, they should immediately negotiate with the home improvement company to avoid the project being “outsourced”. Secondly, we must also check on-site construction tools and materials placement, whether it meets the requirements in the contract, whether the equipment such as fire prevention and moisture protection is complete, and whether the workers' site management is standardized.

A week or so after the start of construction, the materials needed for construction will enter the site one after another. This is the most critical part of the initial site inspection. After the home improvement materials are introduced, they generally require the chief, the designer, and the owner to jointly carry out the inspection and acceptance. Whether the field material is the brand material of the home improvement company, whether the brand, material model, style, and color specified in the contract are in conformity with the provisions in the contract. If special environmental protection materials are involved, the home improvement company should also be required to present the environmental protection test book.

After the home improvement material enters the site, it is necessary to pay attention to the behavior of the foreman in stealing the column during the construction process, or to provide the materials provided by the company smoothly, and then fill up the space with additional materials. Once a problem arises, maintenance will be involved in the sale. Unclear.

Mid-term construction - wall and wood construction

Mid-term construction involved wall treatment, wall tiles, floor tiles and wooden construction. If the wall surface treatment requires re-approval of scraping or anti-cracking treatment, it shall be carried out in strict accordance with the process specified in the contract, and the number of times of brushing the top coat of the primer shall also comply with the contract.

When paving the wall tiles, it should be noted that the soaking time of the wall tiles should be at least 2 hours. When the workers lay the wall tiles, pay attention to whether the flatness of the wall tiles meets the predetermined requirements. In order to avoid skewing the wall tiles, workers may be required to pull wires before laying.

If the interior wood construction involves the installation of veneer panels, attention should be paid to whether chamfer seams are made in the splicing of the super-length veneers, and whether the splicing of the extra-long cornices is reinforced. After the mid-term project was completed, most of the projects in the home improvement were basically completed, and the effect of home improvement gradually revealed. In particular, large-scale projects such as TV background walls and on-site custom locker cabinets need to be compared with whether the design and drawings meet the design requirements.

Late construction - check overall design drawings

There are not many large projects in the later stage of construction. The floor coverings are paved by professional floor covering workers, and the floor must be cleaned before laying. When the construction is nearing completion, it is critical to check whether the overall construction results are consistent with the design drawings.

Check for broken woodwork items, whether the surface is flat or drumming. Whether the bedroom door and other inner doors are open or not is normal. When the door is closed, the door should be tightly closed on the left and right doors, and the gap between the lower door and the door should be moderate, generally 0.5 cm.

When inspecting the wall, pay attention to whether there is unevenness, drumming, etc. The tiles of the tiles can be checked to see if the gaps are neat, then use the ruler to check the verticality and flatness of the tiles, and then check the yin and yang angles. Whether the brick is square, and then observe whether the grout of the floor tile is firm and full.

The above specification on interior decoration construction is briefly introduced here, and I hope to help you. For more information, please visit this website. Stay tuned.

Interior decoration construction knowledge