Pre-construction homework You must understand the waterproof knowledge of the bathroom

Bathroom waterproofing sounds like a small thing, but it is not. If the waterproofing is not done well, after all the renovations have been completed and the bathroom hasn't been properly waterproofed, that would be a big deal. It is better to lay the foundation at the source than to issue later.

The waterproof treatment of the bathroom not only needs to be waterproof on the floor, but also requires various treatments of the wall surface and the gap. It can be roughly divided into four steps:

Toilet waterproof construction step 1,

Before the waterproof treatment of the bathroom, the ground level of the toilet shall be leveled first, the ground shall be uneven, the unevenness may be applied when the waterproof coating is applied, or the ground may be easily broken due to unevenness, even if it is Painted with waterproof paint will also crack with the ground.

Toilet waterproof construction steps 2,

Waterproof paint brush height problem. Waterproof treatment is also required on the wall of the bathroom. Generally, 30cm is brushed on the wall from the ground level. This is to prevent the accumulation of water infiltrating the wall to form a damp. However, many families use the shower room. In this area, it is necessary to apply a waterproof coating to 180cm so that the water from the sprinkler will not penetrate into the wall; if it is a bathtub, it will be painted 30cm above the bathtub.

Toilet waterproof construction steps three,

Reserve time: The waterproof layer should be left for a certain period of time after completion to allow the waterproof layer to better integrate with the building. Then protect the waterproof layer on the floor tile. During the construction process, the waterproof layer should be protected as much as possible. .

Toilet waterproof construction steps 4,

Follow-up construction: Waterproof work is a hidden project. Subsequent construction may also damage the waterproof layer. If the floor tile has been laid, do not use floor tiles. Use professional waterproofing materials to block all the gaps and make it waterproof. Enough. The same applies to the bathroom after the failure of the waterproof layer.

Bathroom Bathroom Decoration

Explosion Proof VFD

Coal Mine Vfd,Explosion Proof Vfd,Drive Belt Conveyor Vfd,Coal Mine Explosion Proof Vfd

Jiaozuo Huafei Electronic & Electric Co., Ltd. , https://www.intelligentmine.com