Supervision analysis: whether the decoration is half wrapped or fully wrapped

At present, most home improvement companies offer half-bribs and all-inclusive packages. Many homeowners are difficult to choose between full-package and half-package when decorating. First, it is unclear which type of decoration they should choose, and second, they do not understand all-inclusive packages. Half package difference. Let everyone choose their own decoration mode. For owners who do not understand building materials, are they half-wrapped or fully wrapped? Which is more cost-effective? Supervisors analyze their respective characteristics for the owner's reference.

What is all-inclusive?

The characteristics of all-inclusive is that financial resources are also called contractors and materials, and all materials are purchased and constructed by the constructor. The advantage is that it is relatively time- and labor-saving and hassle-free. The power and responsibility are clearer. Once the decoration has quality problems, the responsibility of the construction party cannot be shirked because all the work materials are responsible for them.

The disadvantage of all-inclusive

The biggest drawback of all-inclusive package is that the decoration company is less shoddy and inferior. Higher costs. And due to the chaotic decoration market, some small and medium-sized home improvement companies lack credibility, let alone home-made guerrillas. Due to the price and variety of materials in the market, most of the owners know little about this, so once the construction party falsely reports the price, or jointly with the materials business, the owner is difficult to determine. If you know little about the decoration, the credibility of the home improvement company you are looking for is relatively high.

Editorial view

All-inclusive summary suitable for the object: all-inclusive for very busy or economically affluent people, because the whole package is to save more money.

What is a half package?

Half bag features are more effective. Between the clearing and all-inclusive methods, the main materials are purchased by the owners, and the construction and accessories are purchased by the constructor. The advantage is that the owners control the main expenses by purchasing high-value raw materials themselves, and the owners do not have to figure out the kinds of auxiliary materials with complex and low value, and the construction party is more at ease. However, the owners are required to use the ability to identify the main materials, they will buy it, or they will have to wait for it.

Main materials include: floor tiles, flooring, wall tiles, baseboards, hardware accessories, toilets (toilet, basin, partition, shower, bathtub, floor drain, triangular valve, mirror, floor tile, wall tile) kitchen (hanging cabinet, Floor cabinets, floor drains, triangular valves, cooktops, range hoods, floor tiles, and wall tiles) wardrobes, sliding doors, bedroom kitchens, bathroom doors, etc.
The auxiliary materials include cement, yellow sand, red brick, water pipes, wires, network cables, switch panels, gypsum board, wood board, plug board, nine PCT board, plywood board, latex paint, caulking agent, adhesive tape, and hardware ( Nails, screws, etc.)

The disadvantage of half bag

The disadvantage is that half of the package is provided by the decoration company or construction party. Therefore, for the owner, it is necessary to prevent budget leakage and false positives. Second, it is necessary to purchase the main material on time to avoid affecting the construction progress. Third, once the material occurs The problem is that the construction party and the material supplier will be in tears. Since the main and accessories are purchased separately by the owner and the constructor, the owners must pay special attention to the main materials. Those who have a certain understanding of home decoration and who are subjectively willing to choose half a pack will do more with less.

There is a pit note here: Prior to the signing, the accessories provided by the decoration company are brands, but when the construction is really done, some unknown brands will be used, so the industry is paying attention. Before the signing of the contract, the decoration company should clearly list the brand, quantity, and price of these materials, as well as any problems with the original materials, what brands should be replaced, or solutions, etc. No contract is signed, and all must be written in the contract. In short, if the contract has not been signed yet, it must be detailed, detailed, and detailed. The finer the front, the less likely it is that the back is cratered.

Editorial view

Semi-package summary suitable for the object: there is a certain ability to identify the main decoration materials, and there is time to buy, while at the same time as possible with the formal decoration company signed a detailed renovation contract, it is best to sign closed contract, to avoid the construction of missing items, variables, etc. The situation occurs.