Home decoration paving tiles to follow six major processes

Whether or not the tiles are beautiful and durable is closely related to the quality of the tiles themselves, but it is even more important whether the tiles are tiled according to the correct tiling process.

Brand Shop: Roman Leo Tiles

Process:

Grassroots processing → elastic line → pre-shop → paving → grooving → cleaning

Construction Technology:

Before laying, molds shall be made to select bricks. Tiles with large deviations from the dimensions shall be selected and used at corners or not.

(1) Primary treatment: Dust and debris should be thoroughly cleaned, and there should be no defects such as emptying, cracking, and sanding.

(2) Stretching line: Before the construction, the elevation control line is popped around the wall, and a crosshair is popped out on the floor to control the floor tile separation size.

(3) Pre-paving: First of all, we should strictly select the color, texture, and surface smoothness of the floor tiles based on the drawings design requirements, and then pre-shop according to the drawings. The size, color and texture errors that may occur in the pre-paving are adjusted and exchanged until the best effect is achieved, and the paving is smoothly stacked and stored.

(4) Paving: laying a 1:3 dry hard cement mortar, mortar thickness of about 25mm. Before the tile is applied, the back of the tile shall be wetted. Place the tiles on the cement mortar as required and tap the tile finish with a rubber mallet until the flatness is reached.

(5) Stitching: Clean the joints 24 hours after the tiles have been laid, wipe the impurities in the gaps in the tiles before jointing, and use a special joint sealant.

(6) Cleaning: After the construction process (usually after 24 hours), clean the surface of the floor tile with cotton yarns and Other objects.

Tile laying quality:

The surface of the tiles is clean, the pattern is clear, the color is the same, the joints are even, the periphery is straight, and the joints are smooth and smooth, and the plates are free of cracks, falling angles, and missing defects.

Ground tile laying:

1. Tiles must be immersed in water for half a day before use. Bricks do not bubble.

2, the kitchen, bathroom should have a water slope, no water, water does not flow back. If the original waterproof layer is destroyed during construction, waterproof treatment shall be done. There is no leakage during the 12-hour test of accumulated water.

3. After the floor tiles have been laid, cover them with cardboard, etc., and walk on the brick surface at least after 24 hours.

Laying of wall tiles:

1. When processing grassroots, all kinds of dirt on the wall should be cleaned up and watered and moistened one day in advance. If the grass-roots level is a new wall, when the cement mortar is 70% dry, bricks, bullets, and sticky-sandwich wall tiles should be used.

2. Tiles must be soaked in clean water for more than 2 hours before they are affixed. Tiles should not be bubbling and should be removed for drying.

3, when sticking to meet the pipeline, lighting switch, bathroom equipment support, etc., must use a whole set of bricks to cut anastomosis, prohibit the use of non-whole brick patchwork paste.

Recommended links: had to look at this site to record the process of laying kitchen tiles

Recommended links: Comprehensive interpretation of the purchase and construction of floor tiles

Tiles Tiles Tiles Tiles Cement Switches Toilets Designs Toilets Waterproof Toilet Tiles Bathroom Tiles Bathroom Sizes Kitchen Tiles

Travel Mirror

Travel Mirror,High Quality Travel Mirror,Travel Mirror Details, PROTRONICS COMPANY LIMITED

Ningbo Winsun Metal Products Co., Ltd. , http://www.chinakeysafe.com