Flg Floor Standing Bathtub Faucet

Model NO.: 1013
valve Core: Ceramic
Flexible Hose Size: 1/2 or 3/8 or 9/16
Usage: Hotel Bathroom,Bathroom
Working Temperature: 1-99degree
Packaging: Brown+Foam Packaging
Installation: Deck Mounted
Surface: Brass
Service: Laser Mark, ODM/OEM
Trademark: flg
Transport Package: Cardboard Box or Color Box
Specification: G1/2′′, 3/8′′, 9/16′′ for option
Origin: China
HS Code: 8481809000

 
FLG Floor standing Bathtub Faucet
 
Faucet Type Floor standing faucet
Installation Type Deck Mounted
Installation Holes Single Hole
Surface Finished Chrome
Finish Chrome
Flow Rate 1.8 GPM (6.81 L/min)
Valve Type Ceramic Valve
Cold and Hot Switch Yes
Material Brass
Model number 1013
 
 
 
---About Us
 
-Wenzhou Bomei industrial Co., Ltd was established in 2000.
-We manufacture bathroom and kitchen hardware.
-Our goods mostly be used in home, hotel, and other public place. 
-We have highly professional and hard working workforce.
-our company has a total 300 workers in it's pay-roll.
-Hope Bomei industrial Co., Ltd service you from now on.      
FLG unique sanitaryware basin Waterfall bathroom faucet Oil Rubbed Bronze Black Vessel Faucet
 
---Packing & Shipping
 
Packaging Detail
Inner Packing:Bubble bag,cloth bag,or foam.
Outer Packing:Carton,the package can be done as customers' requirements.
Delivery Detail
Estimated samples delivery time is 10-15days;
20ft container is 30-45days;
40ft container is 45-60 days
Shipping information
Normally, we will deliver the sample products via international express, such as DHL, FedEx, UPS. For bulk order goods, it will be delivered to customer by ocean.
 
 
---Company Profile
Wenzhou Bomei industrial Co., Ltd was established in 2000, We manufacture bathroom and kitchen hardware such as: Automatic faucet, automatic urinal flusher, basin faucet, shower faucet, mirrors, and other Accessories. Our goods mostly be used in home, hotel, and other public place.
 
We have highly professional and hard working workforce, However our company has a total 300 workers in it's pay-roll. And there is a cordial and peaceful relationship between the management and the entire workers.
 
Business competition is necessary in both domestic and international business. However, our company has a strong competition in the international market with other competitors.
 
Inspite of this, our company has been the best so far, this is as result of our great attention on quality and after-sales-services.
 
In recent years, Our company has maintained a steady growth in it's profit and sales margin.
 
Hope Bomei industrial Co., Ltd service you from now on.
 
 
 
 
 

The Installation of Mounting Unit
1. Make the concrete base according to solution drawing, locate embedded bolts and set out strings by Laser Level to ensure the centers of embedded bolts in the same elevation as accurate as possible on vertical, horizontal direction and at end face.
2. Locate the Anchor Plate on the concrete base and adjust the position according to solution drawing(remove M14 washer,M14 spring washer,and M14 nut if they are connected to embedded bolts now),and then fasten M14 washer, M14 spring washer, and M14 nut with the tightening torque of 60N.m.
3.Take out the Hexagon Bolt Kit with Post B Corrugated Gasket M12x95 and remove its nut, spring washer, one washer, and corrugated gasket. Insert the Post A, B, C in to Anchor Plate according to the Hexagon Bolt Kit with Corrugated Gasket M12x95 drawing and then fix them by two sets of Hexagon Bolt Kit with Corrugated Gasket M12*95. Post C Post A
4.Remove the bolt kits M12*90 from all the Posts and Pre-Assembled Supports and unfold the embedded Supports, fasten them on the Posts by bolt kits M12*90 according to the drawing. 

Installation of Rails
1.Please check the length of Beam before place it onto the Pre-Assembled Supports, otherwise extend it with Splice forBeam first. There are 4 self-tapping screws in each side and total 8 self- tapping screws in both sides. We strongly recommend NOT extend the Beams on Preassembled Supports.
2.Before locate the Beams, mark the position of the Beam son the surface of Pre-Assembled Supports with maker pens according to solution drawing for easier installation. Place the Beams on the 55*80 Tube of Pre-Assembled Supports and fix it with C Clamp Kits. Install all the Beams in the same step. The tightening torque will be 20N.m. C Clamp Kit Side Beam(Please arrange 3-4 persons to install when the array is long.)

Installation of Solar Panels
1.Place the panels above the Beam 85, fixing it with Wide End Clamp Kit in the side and Inter Clamp Kit in the middle. Install all the panels in the same steps until complete installation of al panels. Fasten all the bolts with tightening torque of 10N.m.
2.Complete installation, and please inspect and make sure all the bolts are fastened.

Solar Mounting System For Green House

Solar Mounting System For Green House,Eco-Green House Solar Mounting System,Green House System,Ground Mounting System

Hebei Honde Plastic & Metal Co., Ltd. , http://www.foundation-system.com