The first batch of photovoltaic industrial park project directory has issued a subsidy of 0.42 yuan/degree.

The first batch of photovoltaic industrial park project directory has been issued with a subsidy of 0.42 yuan/degree. As the Golden Sun project officially ended in 2013, the distributed photovoltaic demonstration area began to enter the stage.

On June 16, 2013, the National Energy Administration convened seven administrative provinces, three municipalities, and four planned cities to set up a working meeting for distributed photovoltaic power generation, requesting seven provinces and seven municipal energy bureaus to meet in July. The implementation plan of the demonstration area will be completed and reported by the 10th. The approved demonstration area will need to start the project construction before the end of July 2013. It is reported that seven provinces are Hebei, Guangdong, Jiangsu, Zhejiang, Shandong, Liaoning and Jiangxi; seven cities are Beijing, Shanghai, Tianjin, Shenzhen, Ningbo, Qingdao and Dalian.

Shortly after the "Distributed Photovoltaic Power Demonstration Area Work Plan" was issued, a subsidy program for individual distributed photovoltaic power plants detonated the entire photovoltaic industry, and the introduction of this program was Jiaxing PV Industrial Park. The reporter learned from several companies and local people that according to this plan, Jiaxing Photovoltaic Industrial Park will grant a subsidy of 2.8 yuan per degree for a personal distributed photovoltaic power generation project built in a 14.2 square kilometer park. The subsidy period is for a period of three years. , a drop of 5 cents a year, that is, the power subsidies for 2013-2015 were 2.8 yuan, 2.75 yuan, and 2.7 yuan respectively.

Behind Jiaxing's high subsidies for individual distributed photovoltaic power plants, several companies revealed that the subsidy programs in various provinces are brewing or have been released. The subsidy is a subsidy of 0.25-0.3 yuan/degree on the basis of state subsidies. In 20 years, the state subsidy level may eventually be set at 0.45 yuan/degree, and the time limit is also set at 20 years.

Recently, the Polaris Solar PV Network reporter learned from the relevant person in charge that the state has issued a list of approvals and subsidy programs for the first seven provinces and seven cities for photovoltaic industrial park demonstration projects. The subsidy standard was determined at 0.42 yuan/kWh, which was lower than previously expected. Regarding the list of approvals for the first demonstration projects of photovoltaic industrial parks, the reporter will pay more attention.

Polyethylene anticorrosive adhesive outer  tape and polyethylene anticorrosive inner tape belt, polyethylene anticorrosive patch and anticorrosive primer together form polyethylene cold tape anticorrosive system. The polythene anticorrosive adhesive outer tape has the thicker base film and thin film, which mainly protects the corrosion and becomes a protective belt.

Outer Tape

Pipe Outer Wrapping Tape

Pipe Outer Wrapping Tape,Polyethylene Tape,Pipe Wrap Tape,Anticorrosion Butyl Rubber Tape,Outer Anti-corrosion Tape,Pipeline Outer Wrap Tape

Jining Qiangke Pipe Anticorrosion Materials CO.,Ltd , http://www.pipe-wrap-tape.com