Peristaltic pump handling and installation

Peristaltic pump handling and installation a. The user receives the equipment, the packing list should check the equipment, spare parts, random files, etc. are complete; b. Handling, the pump housing to the lower part of the screw and the motor as a focal point, And to be gentle, do not have a big shock and impact. c. The pump should be installed in a spacious and easy to maintain place, the foundation needs to be flat. d. The diameter of the pump inlet and outlet piping should not be less than the specified requirements. In order to facilitate the maintenance, when using suction on the condition, the pump outlet pipe can be installed in the valve; when using the pouring conditions, the pump inlet and outlet pipes are equipped with valves, but the pump at work All valves must be fully open. e. When the viscosity of the medium to be transported is large (> 10000 cps), the inlet piping should be as short as possible and use a backfill condition. f. When the pump is installed on a hard pipe, it is best to load a hose about 1.5m at the pump inlet and outlet to reduce pump pulsation and facilitate pump maintenance. Peristaltic Pump Related Articles Read: Understanding How Peristaltic Pumps Work Peristaltic Pumps Benefits RGB Series Hose Pumps Before Starting up