Automatic feeding spraying machine safety operation procedures

How to safely operate the automatic feeding machine? The automatic feeding spraying machine is also called the automatic feeding spraying machine. Henan Fenqiang spraying machine manufacturer analyzes the safety operation rules of Suli's automatic feeding spraying machine and hopes to help the operation of the automatic feeding spraying machine. .
1. Prepare the automatic feeding spraying machine before starting up. 1. Open the lid of the air cleaner on the tank and inject clean 32 or 46 anti-wear hydraulic oil into the tank. The refueling height can be observed in the tank. Control the oil mark next to the switch. When the reversing bucket is in the lowest position, the height of the hydraulic oil in the tank should be observed in the oil standard. Because the oil level rises, the oil level is lower than the oil level. Therefore, the oil level is at the top of the oil standard.
2. Open the spraying machine, add the bolts of gear oil, add gear oil, and see the oil from the oil window position.
3. Start the automatic feeding spraying machine and drive it to the vicinity of the spraying work surface.
4, access to three-phase 380 volt power supply, observe the voltage meter on the control panel of the electronic control box shows whether the voltage is about 380 volts, if the voltage is lower than 360 volts, is strictly prohibited, otherwise it will cause the machine to work due to low voltage normal.
5, determine the positive and negative. Press the sprayer motor start button to observe whether the motor steering is the same as the marked steering. If it is different, the correct steering can be determined by means of phase modulation (the steering has been adjusted before leaving the factory). Confirm pump motor steering.
6. Start the oil pump motor and first extend the outrigger cylinder to ensure that the rear wheels are not bearing. To ensure balance, it is recommended that the sleepers be placed just below the leg cylinders.
Second, the power of automatic injection gun machine operation process 1, connected to the gas circuit and the injection system. Close the main valve of the air duct system, connect the construction air duct joint with the local air duct, and connect the spraying pipe and water pipe of the spraying machine.
2. Spraying slurry construction process:
(1) The transporter dumps the concrete material directly into the tumbling bucket through the feeding support. The concrete material is a tidal spray material, and its moisture content should not be greater than 0.2, otherwise it will affect the feeding material discharge.
(2) Press the oil pump switch, the oil cylinder fixed on the bracket will turn the flip bucket upside down, pour the material into the upper storage hopper, close the oil pump motor and drop the turning bucket, the falling speed can be controlled by the position of the valve lever, and the joystick is located at the bottom When it is fastest.
(3) Turn on the sprayer switch and start spraying the slurry according to the spraying requirements.
(5) When the material in the spraying hopper is lower than the screen, the storage hopper vibration motor switch is turned on to control the feeding.
(6) When the material of the upper hopper is running out, repeat the operation of (2) and complete one cycle.
(7) When the large particles of material in the screen of the spraying machine hopper accumulate too much, the particles should be cleaned in time.