Old house renovation steps make houses no longer shabby and refreshed

The transformation of old houses is a tedious and vast project. It is necessary not only to carry out main body demolition and reform, but also to optimize space, waterways and circuits so as to make the old houses look new and new. So what is the old house renovation process ? Let's take a look with Xiao Bian!

Old house renovation steps :

1, the old house renovation steps --- the main body

During the renovation, the main body should be dismantled, including the removal of walls, floors, doors, windows, waterways, and electric circuits. The dismantled garbage should be cleared in time to keep the interior clean and tidy.

2, the old house decoration steps --- structure optimization

Generally, the structure of the old house is not very good, so the structural optimization should be carried out during the demolition. For example, the kitchen can be made into an open kitchen, and the toilet bowl toilet can be changed to a sitting toilet. However, in the optimization, load-bearing walls can not be removed to avoid leaving security risks.

3, the old house decoration steps --- hidden project

The concealed project is a project that is most prone to problems when it comes to home improvement. Therefore, when doing hidden works, it is necessary to check whether the equipments for water supply, air-conditioning, pipelines, and lines in the ceiling are closed. Whether the electrical insulation, resistance test meets the requirements, and whether the fuel material is used for fire prevention treatment.

4, the old house renovation steps --- water optimization

Waterway reconstruction is one of the most important projects for renovation of old houses. Therefore, waterways should be optimized, but before optimization, the industry should first check whether there are rust and aging in the old houses and the waterways. If any, it is better to replace the new PPR pipe and wait for the waterway to be modified before closing the water test.

5, the old house renovation steps --- circuit optimization

Circuit reconstruction is also one of the key projects for the transformation of old houses. It is understood that the old home circuit is generally used aluminum wire, and aluminum wire is not only easy to aging, and poor thermal conductivity, it is easy to heat and cause fire. Therefore, when the circuit is optimized, it is safer to replace the aluminum wire with a 2.5mm copper wire.

6, the old house renovation steps --- wall, ground optimization

When carrying out wall and floor optimization, we must first survey the houses to see whether the ground and ceiling are flat, cracked, and whether there are any phenomena such as shedding or sanding. If there are any of the above conditions, it is best to remove the wall and the ground, then use the cement mortar as a basis for processing, then scrape the water putty, and then do optimization.

The article is summarized: Well, the relevant knowledge of the old house renovation steps is introduced here, and there are friends who need to know more information, please continue to pay attention to this site, we will have more exciting content for you.

Steel Rail are the main part of railway tracks.Its function is to guide the locomotive wheels of the vehicle to go forward, and bear the huge pressure of wheels.The  type of steel rail are based on  the weight in kilograms per meter, which can be divided into the Crane Rail , heavy rail and light rail .

Product:Steel Rail 
Size:9KG/M-QU120
Materials: Q235,55Q,U71Mn,50Mn,45Mn
Thickness:/
Standard: GB 2585-2007,
Crafts: Hot rolling
Connection: Welding.Fish Plate.
Package:  According to customer requirements.
Brand Name: HY 
Place of Origin: China (Mainland) 
Certification: API 5L.ISO.UKS.SGS.BV 
Application: Chemical, Water, Oil and gas, Electricity
China Steel Rail

Steel Rail

Steel Rail,Heavy Steel Rail,Qu70 Crane Specific Rails,Stainless Steel Railing

CANGZHOU HAOYUAN PIPE FITTINGS MFG CO.,LTD , https://www.pipefitting-china.com