Precautions before signing a contract

There has been a rapid increase in disputes related to home renovations. Many of these disputes are caused by rigorous signing of contracts. Many consumers are not very familiar with and understand the specific terms of the contract text. In actual use, due to the omission of certain terms, it may also cause disputes with the decoration company. You should pay special attention to the following ten aspects. These are issues that are prone to disputes:

The main body of the contract is not clear

The contract should first fill in the name and contact method of Party A and Party B. Here we should pay attention to a detail. Many companies only cover one chapter with company name. You must ask the decoration company to fill in the content and check it. You should also pay attention to the name of the fitting company that signed the contract, and whether it is the same as the name of the company that was stamped on the contract. If they do not match, you must ask the relationship between the two and indicate on the contract. The reason for this is that in the event of a dispute, there must be a relatively complete legal person registration status for the decoration company to prepare for future complaints or prosecutions, eliminating the hassle of inquiries and being able to find the exact responsible person.

Supervision concept is fuzzy

The contract stipulates that engineering supervision can be carried out. "Project supervision" refers to the supervisor's entrustment by the consumer, that is, party A, to supervise and manage the construction project. “Supervisor” refers to a company that has acquired a qualification certificate, a legal person, a supervisory office, or a company. From this we can see that as an engineering supervisor, his identity is independent of the decoration company. Some home improvement markets promise to provide consumers with free supervision. The effectiveness of its supervision over the quality of decoration works and its role remain to be discussed.

Incomplete documentation

The project budget book approved by both parties and a full set of design and construction drawings are all valid constituent elements of the contract. When some decoration companies signed a decoration contract with consumers, these written documents were incomplete and brought hidden dangers to the future home improvement projects. Consumers should keep the above three documents and payment documents securely.

Unclear rights and obligations

The contract stipulated the work that should be done by both parties to ensure the smooth progress of the project. For consumers, pay particular attention to the following items specified in the contract: To ensure the safety of buildings, indoor load-bearing structures cannot be removed. If the non-load-bearing structures or equipment pipelines of the original buildings are demolished and changed, they shall be responsible for going through the corresponding approval procedures for the housing management department. If during the construction period the room is still used by consumers, the consumer shall be responsible for the protection of the construction site and fire protection. Without hampering the normal operation of the construction team, consumers can check the progress and quality of the project at any time.

Increase or decrease items did not join the contract

At present, in the actual performance of the renovation project, there are many phenomena in increasing construction projects. Some decoration companies began to intentionally make the quotation very low, and then gradually increase after the start of the work, so that consumers can no longer find another decoration company, they had to agree with their requirements, making the final decoration far beyond the initial price, so consumption When the contract is signed, if it is understood by multiple parties, and then it is reasonable to combine the expenditure with the house area and construction project on its own, the construction project should be changed cautiously. If during the construction process, due to the increase or decrease of construction projects or other factors, the original contract must be changed, consumers and decoration companies must agree and sign a written change agreement, related to the duration, project budget and Drawings must be changed and signed by both parties.

Material supply is not confirmed

In view of the decoration materials brands and prices and other factors, most of the decoration companies currently recommend that consumers choose "Party B, part of the package material, Party A to provide part of the material," namely the second way specified in the contract for construction. In terms of material supply, both parties should bear certain responsibilities. Consumers are obliged to provide materials according to the agreement, and ask the decoration company to provide them.

Decoration contract entrance decoration decoration decoration decoration company interior decoration door price decoration decoration company

Ultraviolet Sterilizing Lamp

Ultraviolet Sterilizing Lamp,Ultraviolet Germicidal Lamp,UV Lights and Lamps,UV-C Germicidal Lamps,UV Light

Ningbo Deamak Star Intelligent Technology Co., Ltd , https://www.deamakstar.com

Previous: Decoration quote review knowledge

Next: None