Laying of wall tiles and floor tiles

Wall tile laying points:

1: When the grassroots is being dealt with, all kinds of dirt on the wall should be cleaned, and the water should be moistened one day in advance. If the grass-roots level is a new wall, when the cement mortar is 70% dry, bricks, bullets, and sticky-sandwich wall tiles should be used.

2: Tiles must be soaked in clean water for more than 2 hours before the paste, bricks do not bubble prevail, remove the dry stand-by.

3: When meeting the pipeline, lighting switch, bathroom equipment supporting parts, etc., must use a whole set of bricks to cut anastomosis, prohibit the use of non-complete brick patchwork paste.

Ground tile laying points:

1: The tiles should be immersed in water for half a day before use. Bricks should not bubble.

2: The kitchen and bathroom should have a water gradient, no water, water does not flow back. If the original waterproof layer is destroyed during construction, waterproof treatment shall be done. There is no leakage during the 12-hour test of accumulated water.

3: After the floor tiles are laid, bricks should be covered with cardboard, etc., and walk on the brick surface at least after 24 hours.

Decoration point switch cement bathroom waterproof bathroom tile bathroom floor tile kitchen tile